Multistate coverage

Rock Drilling and Pile Driving for Large-Scale Projects.

A rock drilling and pile driving contractor with a newly expanded Epiroc fleet, over 20 GW of pile load testing since 2018, and zero recordables since 2015.

2015In business since
0TRIR · zero recordables
4" to 10"Across solar projects
20+ GWTested since 2018
MultistateProject coverage
What we do

Rock drilling across industries. Solar pile installation and load testing.

XCEL works in the industries where the ground decides the schedule. For solar, that means pile load testing, rock drilling, and pile installation, from first engineering through production quality control. For construction, mining and aggregates, and seismic exploration, it means rock drilling sized to the job. Engineering support is there when an Engineer of Record needs trained crews and field data for a test plan.

We run modern Epiroc rigs with trained crews, use GPS to support our own operations, and coordinate rapid nationwide mobilization to the job.

Pile load testing

Over 20 GW Tested Since 2018.

Major EPCs and leading tracker OEMs trust our crews on some of the country's largest utility-scale solar projects, typically 100 MW to 600 MW each.

See Pile Load Testing
Excavator applying load during a pile load test
Services

Three services. One schedule.

From the first test pile to production, one subcontractor keeps engineering, drilling and installation moving together.

Pile load test with load cell and dial gauges on a solar pile
Pre-Construction · Production QC

Pile Load Testing

Uplift, lateral and compression tests for Engineers of Record.

Learn more
Epiroc rig pre-drilling among laid-out solar piles
Solar · Construction · Mining · Seismic

Rock Drilling

Solar pre-drill, 4" to 10" across utility-scale projects, plus anchor-hole, blast-hole and seismic shot-hole drilling.

Learn more
Two tracked pile drivers installing solar piles on a solar site
Solar only

Pile Installation

Pile installation for solar trackers and fixed-tilt.

Learn more
Two Epiroc drill rigs drilling side by side in golden-hour dust
Fleet

Built for scale.

A newly expanded Epiroc surface drill fleet gives us the capacity to run multiple rigs on one project and hold production in hard rock.

Explore the Fleet
Industries

Industries we serve.

Specialty drilling and solar pile installation work, sized to the ground and the schedule.

XCEL crew in PPE in front of two Epiroc D65 drill rigs
Safety

Zero recordables. TRIR 0. Since 2015.

TRIR 0EMR 0.89MSHA 48OSHA 30CPR / First AidISNetworld

EMR 0.89. Every employee holds MSHA 48, OSHA 30 and CPR/First Aid.

Our Safety Program
Projects

Recent projects.

More than 400,000 holes drilled since 2024 across 1.7+ GW of utility-scale solar.

Two Epiroc drill rigs pre-drilling pile locations on a graded utility-scale solar site
South Central · 2026

350 MW Utility-Scale Solar

Solar pile pre-drilling.

104K+ holes6"
XCEL rig pre-drilling a solar pile location in desert scrub
South Central · 2026

253 MW Utility-Scale Solar

Solar pile pre-drilling.

89K+ holes6.5", 8" and 9"
Three Epiroc drill rigs lined up on a solar site
South Central · 2026

251 MW Utility-Scale Solar

Solar pile pre-drilling.

74K+ holes6"
View All Projects
Service area

Multistate coverage includes these 19 states.

Tell us where your project is and when you need to start. Projects in other states are available. Contact XCEL to discuss your project location and requirements.

NortheastMaine, New Hampshire, Vermont, New York, Pennsylvania
Midwest & Ohio ValleyOhio, Indiana, Illinois, Iowa, Missouri, Kentucky
Great PlainsNebraska, Kansas, South Dakota
South CentralTexas, Oklahoma
Mountain WestColorado, Wyoming, Idaho
Request a Quote
AKMEVTNHWAIDMTNDMNILWIMINYRIMAORNVWYSDIAINOHPANJCTCAUTCONEMOKYWVVAMDDEAZNMKSARTNNCSCDCOKLAMSALGAHITXFL
These 19 statesOther states — contact XCEL
Careers

Careers at XCEL.

DOL-approved Registered Apprenticeship. Wages above industry standard. Travel per diem and mobilization covered. Health coverage through an ICHRA plan.

See Careers
XCEL crew in PPE in front of two Epiroc D65 drill rigs

Tell us about your project.

Drawings, geotech, a pile count or just a start date. We respond to every quote request within 24 hours.

Request a Quote
Zero recordables. TRIR 0. Since 2015.