
Pile load testing for engineering firms. Operators and field data techs trained to the Engineer of Record's (EOR's) test plan, so your engineers can focus on the engineering.
Engineering and geotechnical firms need field partners who can install test piles, run load tests, operate heavy equipment and record clean data. That leaves the engineer free to focus on analysis and design.
XCEL provides pile load testing for engineering firms, with heavy equipment operators and field data collection technicians trained in data collection per the EOR's test plan. Our record: Over 20 GW of utility-scale solar pile load testing since 2018, on projects typically 100 MW to 600 MW.
Pre-construction test pile installation and axial tension (uplift), lateral and compression testing on fixed-tilt and tracker projects, in general accordance with the standards the EOR specifies, so the EOR can optimize pile embedment and design. Production QC testing verifies installed piles meet design loads. Pile Load Testing · Pre-Construction Testing · Production QC Testing
Experienced operators work under your engineers' direction. Our field data collection technicians are fully trained in data collection per the EOR's test plan, so readings, logs and photos come back complete and consistent.
Drilled and driven test piles, with pre-drilling through rock where needed. Rock Drilling · Pile Installation
Topcon GNSS RTK layout of test locations and a location record for every test.

Most engineering and testing firms don't keep pile drivers, drill rigs and reaction equipment in the yard, and they shouldn't have to. Firms call XCEL when:
Your firm keeps the program design, the procedures, the engineering judgment and the client relationship. XCEL supplies the equipment, the people and the field execution, and stays out of the way of your analysis.

Industries we support alongside you: Solar

Test programs often run on undeveloped sites with heavy equipment and stored hydraulic energy. Every employee holds MSHA 48, OSHA 30 and CPR/First Aid, 15 OSHA 510 holders are on staff, and our crews plan every test before it starts.
No. We install the test piles, run the tests to the Engineer of Record's plan and deliver complete field data, photos and location records. Interpretation, pile design and the client relationship stay with your firm and its licensed professionals. XCEL supplies the equipment, the people and the field execution.
Yes. We provide experienced heavy equipment operators who work under your engineers' direction, and field data collection technicians fully trained in data collection per the EOR's test plan. Readings, logs and photos come back complete and consistent, recorded in your format and delivered on your schedule.
Over 20 GW of utility-scale solar pile load testing since 2018, on projects typically 100 MW to 600 MW. Major EPCs and leading tracker OEMs trust us on some of the country's largest utility-scale solar projects. Engineering firms get the same crews, equipment and data standards on every test program.
Axial tension (uplift), lateral and axial compression load tests, in general accordance with the standards the Engineer of Record specifies, typically ASTM D3689, D3966 and D1143. We run them for both pre-construction programs and production QC testing, and the field data goes straight to the Engineer of Record.
Yes. When test piles hit rock or refusal, our own Epiroc rigs pre-drill the test locations and our pile drivers install the test piles by the approved method. Your program stays on schedule without bringing in a second subcontractor, and every test location is staked and recorded with Topcon GNSS RTK.
Send the program and site location. We respond to every quote request within 24 hours.