Excavator applying load during a pile load test
For engineering firms

Pile Load Testing Your Engineers Can Trust.

Pile load testing for engineering firms. Operators and field data techs trained to the Engineer of Record's (EOR's) test plan, so your engineers can focus on the engineering.

Engineering and geotechnical firms need field partners who can install test piles, run load tests, operate heavy equipment and record clean data. That leaves the engineer free to focus on analysis and design.

XCEL provides pile load testing for engineering firms, with heavy equipment operators and field data collection technicians trained in data collection per the EOR's test plan. Our record: Over 20 GW of utility-scale solar pile load testing since 2018, on projects typically 100 MW to 600 MW.

20+ GWof utility-scale solar pile load testing
0TRIR since 2015
100%of employees MSHA 48, OSHA 30 and CPR/First Aid certified

What we provide

Pile load testing support

Pre-construction test pile installation and axial tension (uplift), lateral and compression testing on fixed-tilt and tracker projects, in general accordance with the standards the EOR specifies, so the EOR can optimize pile embedment and design. Production QC testing verifies installed piles meet design loads. Pile Load Testing · Pre-Construction Testing · Production QC Testing

Heavy equipment operators and field data collection technicians

Experienced operators work under your engineers' direction. Our field data collection technicians are fully trained in data collection per the EOR's test plan, so readings, logs and photos come back complete and consistent.

Pre-drilling and test pile installation

Drilled and driven test piles, with pre-drilling through rock where needed. Rock Drilling · Pile Installation

Layout and location records

Topcon GNSS RTK layout of test locations and a location record for every test.

Crew at a pile load test setup

Pile load testing for engineering firms: when to call XCEL

Most engineering and testing firms don't keep pile drivers, drill rigs and reaction equipment in the yard, and they shouldn't have to. Firms call XCEL when:

What stays with you

Your firm keeps the program design, the procedures, the engineering judgment and the client relationship. XCEL supplies the equipment, the people and the field execution, and stays out of the way of your analysis.

How we work with your engineers

  • Your engineer sets the program, procedures and acceptance criteria
  • We provide equipment, operators and field data collection technicians trained to run it
  • Data is recorded in your format and delivered on your schedule
  • Interpretation and design stay with your licensed professionals
Pile load test underway at night

Our process

  1. 01
    Review the test program and site logistics with your project engineer
  2. 02
    Stake test locations with GNSS RTK
  3. 03
    Install test piles and pre-drill if needed
  4. 04
    Run tests with calibrated load cells and gauges
  5. 05
    Deliver field data, photos and location records

Equipment

  • Doyle Rambo 500 pile drivers and excavators
  • Hydraulic jacks, calibrated load cells, dial indicators and displacement gauges
  • Epiroc drill rigs for pre-drilling
  • Topcon GNSS rovers with UHF radio
  • Morooka rubber-track carriers for site access

Why engineering firms choose XCEL

Industries we support alongside you: Solar

Crew in safety gloves running a pile load test with dial gauges

Safety

Test programs often run on undeveloped sites with heavy equipment and stored hydraulic energy. Every employee holds MSHA 48, OSHA 30 and CPR/First Aid, 15 OSHA 510 holders are on staff, and our crews plan every test before it starts.

FAQ

Questions we hear.

Do you interpret test results?

No. We install the test piles, run the tests to the Engineer of Record's plan and deliver complete field data, photos and location records. Interpretation, pile design and the client relationship stay with your firm and its licensed professionals. XCEL supplies the equipment, the people and the field execution.

Do you provide equipment operators and data collection technicians?

Yes. We provide experienced heavy equipment operators who work under your engineers' direction, and field data collection technicians fully trained in data collection per the EOR's test plan. Readings, logs and photos come back complete and consistent, recorded in your format and delivered on your schedule.

How much pile load testing have you done?

Over 20 GW of utility-scale solar pile load testing since 2018, on projects typically 100 MW to 600 MW. Major EPCs and leading tracker OEMs trust us on some of the country's largest utility-scale solar projects. Engineering firms get the same crews, equipment and data standards on every test program.

Which tests do you run?

Axial tension (uplift), lateral and axial compression load tests, in general accordance with the standards the Engineer of Record specifies, typically ASTM D3689, D3966 and D1143. We run them for both pre-construction programs and production QC testing, and the field data goes straight to the Engineer of Record.

Can you install test piles in rock?

Yes. When test piles hit rock or refusal, our own Epiroc rigs pre-drill the test locations and our pile drivers install the test piles by the approved method. Your program stays on schedule without bringing in a second subcontractor, and every test location is staked and recorded with Topcon GNSS RTK.

Field support for your next test program.